Our client needed to build a new processing building and Pennsylvania Building code required the structure to be protected by a sprinkler system. The problem: No municipal water source was available to supply the necessary quantity of water. The Solution: We constructed a 134,000 gallon concrete tank under the floor to meet the requirements of the sprinkler system.