Thiel College Science Building Phase 1

The Monumental Wall has been topped out at 40′ high

and the structural steel has been erected. The wall will

now be veneered with brick and cast stone as the exterior

finishes proceed.

Leave a Reply

Your email address will not be published. Required fields are marked *